1990 SLB CPS-361 Twin Cementing Skid

1990 SLB CPS-361 Twin Cementing Skid

Available quantity:1

Description

[2024 Refurbishment]

1990 SLB CPS-361 Double Pump On Skid

-2x Engines 8V71 Diesel 8 Cylinders

-2x Allison HT 750 DR Transmissions, 6 Speed

-2x Gardner Denver/ Dowell PG-05 Power ends, GD Fluid ends, Front Pump 5,500 PSI (3.75in Plunger) Rear Pump 10k PSI (5in Plunger)

-4x Centrifugal Pumps for mixing and recirculation of Slurry

-Mixing/Displacement Tub


*This unit was completely rebuilt in 2024, New Hoses, New Fluids, New Filters, New Starters, New Belts, Rebuilding Fluid Ends, Rebuilding Power Ends, Rebuilding Centrifugal Pumps, Preventive Maintenance to Engines and Transmissions, Replacing all butterfly valves, Rebuilding/ Replacing Valve Actuators, Flush to Radiators / New Fluids, Sandblasting and Painting.*


^DOES NOT INCLUDE THE TRAILER IN THE PICTURES^


 -Located in Villahermosa, Tab.

Specifications

ManufacturerSLB
ModelCPS-361
Year1990
ConditionRefurbished
Stock NumberCPS_361_016
EnginesDetroit Diesel Series 8V71
TransmissionsAllison CLT-750
PumpGD/ Dowell PG-05